You are starting a project and want it set up right the first time

The most expensive mistake in a project is made in the first two weeks: starting without recording what has to be delivered, when, and how you will know it is done. Much of what goes wrong afterwards traces back to that.

Where it usually goes wrong

  • The schedule lives in a spreadsheet nobody updates after three weeks
  • The budget is a sum of estimates with nothing underneath them
  • There is no agreement on who takes which decision
  • Risks were named in a kick-off and never looked at again
  • Nobody has written down what falls outside the scope

What we do

We start with a ten-working-day Project Start, longer for a project beyond roughly a hundred and twenty work packages. In it we build the work structure down to the level someone can be accountable for, each package with a start, an end and a number of hours. That structure is validated with you and then recorded as the baseline.

What you are left with

A validated project plan with a WBS, a schedule, a budget and a risk log. From that moment every deviation is a deviation from something, and that is exactly what makes a forecast possible.

And after that

The baseline is not a document that disappears into a drawer. Under Project Control it is measured against every period, and the agreement changes only through a change request that you approve. Setting it up is part of the package price: you do not pay separately for the beginning.